Prepare and run HAZOP workshops with connected engineering documents
Novek brings P&IDs, datasheets, and supporting engineering documents into one view. Prepare draft HAZOP nodes and suggested causes before the workshop, then jump to the relevant source as questions come up during the session.
From study preparation to the live workshop
Support your Hazard and Operability Study (HAZOP) from pre-workshop preparation through to live session discussion, with draft outputs ready for facilitator and study team review.
Consolidate study information
Bring equipment, instrument, and process information from P&IDs, datasheets, and other engineering documents into a single view.
Components and connectivity
Datasheets, alarm lists, and cause & effect
| Property | Value | Source |
|---|---|---|
| Alarm | H | P&ID |
| High alarm limit | 355 kPa | Alarm List |
| Documented trip action | Feed pump stop | Cause & Effect |
Flag mismatches and missing information
See where the study documents disagree or where information is missing from the supplied document set, so the team can follow up before or during the workshop.
Instrument range differs between the P&ID and datasheet.
A referenced pump datasheet was not found in the supplied study documents.
Create nodes and pre-fill suggested causes
Create draft HAZOP nodes and pre-fill the worksheet with suggested causes for guide-word deviations. The facilitator and study team can review and edit the suggestions.
| Deviation | Suggested cause | Documented safeguard |
|---|---|---|
| High pressure | Discharge valve closes | High pressure alarmAlarm List |
Jump to the source during the workshop
Open the relevant P&ID, datasheet, or supporting document from the node or tag under discussion. Give the team a direct path to the source when a question comes up.
| Property | Value | Source |
|---|---|---|
| Alarm | H | P&ID |
| High alarm limit | 355 kPa | Alarm List |
Colour-code nodes on the P&ID PDFs
Apply a distinct colour to each node directly on the P&ID PDFs so participants can see which section is being discussed and where its boundaries are.
3A · Pump discharge to FCV-103
3B · FCV-103 to vessel inlet
See Novek’s HAZOP workflow in action
Walk through how Novek organises P&IDs, datasheets, draft nodes, and colour-coded PDFs for your next study.