HAZOP Preparation & Workshop Support

Prepare and run HAZOP workshops with connected engineering documents

Novek brings P&IDs, datasheets, and supporting engineering documents into one view. Prepare draft HAZOP nodes and suggested causes before the workshop, then jump to the relevant source as questions come up during the session.

All Use Cases
Illustrative P&ID
Node Split Preview
PID-101-A · Sheet 1
Node 3ANode 3B
NODE 3ANODE 3BNode boundary at FCV-1034"-P-1012-A14"-P-1014-A1P-101FCV-103PIA104V-104

From study preparation to the live workshop

Support your Hazard and Operability Study (HAZOP) from pre-workshop preparation through to live session discussion, with draft outputs ready for facilitator and study team review.

01

Consolidate study information

Bring equipment, instrument, and process information from P&IDs, datasheets, and other engineering documents into a single view.

Illustrative product view
Consolidated by tag
P&IDs

Components and connectivity

Design documents

Datasheets, alarm lists, and cause & effect

PIA-104Pressure Indicator Alarm
Single tag record
PropertyValueSource
AlarmHP&ID
High alarm limit355 kPaAlarm List
Documented trip actionFeed pump stopCause & Effect
02

Flag mismatches and missing information

See where the study documents disagree or where information is missing from the supplied document set, so the team can follow up before or during the workshop.

Illustrative product view
Document Checks
MismatchPIA-104
Instrument range

Instrument range differs between the P&ID and datasheet.

P&ID
0 – 400 kPa
Datasheet
0 – 600 kPa
MissingP-101
Document set

A referenced pump datasheet was not found in the supplied study documents.

Expected reference: P-101 Centrifugal Pump Datasheet · Not supplied
03

Create nodes and pre-fill suggested causes

Create draft HAZOP nodes and pre-fill the worksheet with suggested causes for guide-word deviations. The facilitator and study team can review and edit the suggestions.

Illustrative product view
Nodes & Worksheet
Draft nodes2 nodes
3A3A · Pump discharge to FCV-103
3B3B · FCV-103 to vessel inlet
Split Node 3 at FCV-103.
Done. Node 3 is now 3A and 3B, split at FCV-103.
HAZOP Worksheet · Node 3ADraft for review
DeviationSuggested causeDocumented safeguard
High pressureDischarge valve closes
High pressure alarmAlarm List
04

Jump to the source during the workshop

Open the relevant P&ID, datasheet, or supporting document from the node or tag under discussion. Give the team a direct path to the source when a question comes up.

Illustrative product view
Selected tag: PIA-104
FCV-103V-104PIA104H
PIA-104Alarm: H
Properties
PropertyValueSource
AlarmHP&ID
High alarm limit355 kPaAlarm List
05

Colour-code nodes on the P&ID PDFs

Apply a distinct colour to each node directly on the P&ID PDFs so participants can see which section is being discussed and where its boundaries are.

Illustrative P&ID
Marked-up P&ID PDF
PID-101-A_HAZOP_Markup.pdf
Node 3ANode 3B
NODE 3ANODE 3BNode boundary at FCV-1034"-P-1012-A14"-P-1014-A1P-101FCV-103PIA104V-104
Node registerPDF colours
Node 3ABlue

3A · Pump discharge to FCV-103

Node 3BViolet

3B · FCV-103 to vessel inlet

Boundary: FCV-103

See Novek’s HAZOP workflow in action

Walk through how Novek organises P&IDs, datasheets, draft nodes, and colour-coded PDFs for your next study.